Bagassed Based Cogeneration Project

Civil works for 35 MW bagasse based cogeneration project.
 
Main works include:

Construction of steam turbo generator foundations and power house, boiler, auxiliaries ESP and duct supports a switchyard, water treatment plant, water system pumps and tanks, cooling towers, conveyor foundations, bagasse storage shed, pipe rack and steel chimney.
 
Major works executed;

  • Piling works – 20 No. (Each 1.05m Diameter)
  • Earth works – 14,085m3.
  • Concrete works – 7,800m3.
  • Structural Steel works – 160 tons.