Kenya Pipeline Company Installation of Third Pump on Line 1

Scope of the project included:

  • Civil works involving preparation of existing plinths, construction of new plinths for the installation of the third pump including trenching work for electrical & instrumentation, cable laying, bedding, construction of pipe supports for above ground pipe
  • Installation and commissioning of pump-sets (pump sets, fluid coupling, motor and air blast cooler). Welding (to API 1104 and BS EN 499), installation of all suction, discharge pipes, fittings from, including the tee offs from existing suction and discharge pipes and fittings. Tie in in the new suction and discharge pipework to existing system
  • Non-Destructive Testing (NDT) i.e. 100% Radiography of all welds above and below ground joints as per ASME IX
  • Electrical works included supply, installation and commissioning of 1 No. 3.3 kV motor feeder switchyard at PS 3, 5 & 7. Supply, installation and commissioning of 6.6 kV auto transformers and supply and installation of 415v switchgear for LV and auxiliary pumps at each of the seven stations.