olkaria1__1423813588_41.57.104.122

Olkaria I Additional Units Geothermal Power Project

Piling, Civil, Building, Mechanical, Piping, Firefighting, Environmental, HV, Plumbing, Electrical, Control & Instrumentation Works for a 140MW Geothermal Power Plant.

Scope of Work:

  • Piling Works (421 Nos.)
  • Civil and Building Works (Excavation = 50,000 m3; Concrete = 16,500 m3; Rebar = 1,750 MT; Structural Steel = 1,700 MT)
  • Mechanical and Piping Works including assembly and installation of Steam Turbines and Generators, Condensers, NC Gas removal System and Cooling Towers (Piping = 1,450 MT, Equipment = 3,600 MT)
  • Electrical and C&I Works (283,000 m; 1250 instruments calibrated on site)
  • HVAC and Plumbing Works.