Construction of a 3 x 4 MW Geothermal Power Station for a private power producer ORMAT Power. H Young undertook the building and civil works.
Major works executed comprised mainly of:
- Earthworks – 50,000m3
- Concrete works – 11,000m3
- Mechanical installation of 3 x 4 generating turbines, transformers, cooling towers.
- H Young also undertook the installation of more than 6 Kms of high pressure steam and other piping works including the insulation and cladding.
- The project took only five and a half months from a green site to power production.