Client | KENYA PORTS AUTHORITY |
Supervising Engineer | NIRAS PORT CONSULT/ MARISTEDS |
Commence date | SEPTEMBER 2010 |
Completion date | JULY 2012 |
Project Value | KES 1,359 MILLION (US$ 16.7 MILLION) |
- Berth 16-17. Demolition of damaged concrete deck slabs
- Berth 16-17. Removal of concrete near damaged expansion joints
- Berth 16-17. Demolition of damaged concrete soffit at pile tops and preparing steel surface of pile
- Berth 16-17. Preparing surfaces of steel piles for wrapping
- Berth 16-18. Demolition of damaged concrete at landward beam
- Berth 18. Demolition of damaged concrete cover and damaged re-inforcement at soffit in front 5 m
- Berth 18. Saw cut slots and drilling holes for cathodic protection and drains
- Berth 18. Demolition of damaged concrete deck slab and top of crane beam in line B
- Berth 18. Demolition of existing installations
- Berth 18. Demolition of damaged concrete cover on piles
- Berth 18. Saw and cutting in and removal of the asphalt pavement and base for ditches and ducts for the cathodic protection system in the area behind Berth 18 and drilling holes for pipe conduits through beams.
- Berth 16-18. Dismounting of fenders and installation of new fenders
__________________
Country: Kenya
Operating Division: Civil Engineering Works
Market: Ports and Marine