H Young & Co. (E.A.) Ltd

Client HYUNDAI ENGINEERING COMPANY  
Supervising Engineer SINCLAR KNIGHT MERZ (NOW PART OF JACOBS ENGINEERING)
Commencement date   MARCH 2013
Completion date NOVEMBER 2014  
Project Value KES 2,531 MILLION (US$ 29.78 MILLION)  
Piling, Civil, Building, Mechanical, Piping, Firefighting, Environmental, HV, Plumbing, Electrical, Control & Instrumentation Works for a 140MW Geothermal Power Plant.
Scope of Work:
  • Piling Works (421 Nos.)
  • Civil and Building Works (Excavation = 50,000 m3; Concrete = 16,500 m3; Rebar = 1,750 MT; Structural Steel = 1,700 MT)
  • Mechanical and Piping Works including assembly and installation of Steam Turbines and Generators, Condensers, NC Gas removal System and Cooling Towers (Piping = 1,450 MT, Equipment = 3,600 MT)
  • Electrical and C&I Works (283,000 m; 1250 instruments calibrated on site)
  • HVAC and Plumbing Works.
____________________
Country: Kenya Operating Division: Civil Engineering Works Market: Power Generation