Client | HYUNDAI ENGINEERING COMPANY |
Supervising Engineer | SINCLAR KNIGHT MERZ (NOW PART OF JACOBS ENGINEERING) |
Commencement date | MARCH 2013 |
Completion date | NOVEMBER 2014 |
Project Value | KES 2,531 MILLION (US$ 29.78 MILLION) |
Piling, Civil, Building, Mechanical, Piping, Firefighting, Environmental, HV, Plumbing, Electrical, Control & Instrumentation Works for a 140MW Geothermal Power Plant.
Scope of Work:
- Piling Works (421 Nos.)
- Civil and Building Works (Excavation = 50,000 m3; Concrete = 16,500 m3; Rebar = 1,750 MT; Structural Steel = 1,700 MT)
- Mechanical and Piping Works including assembly and installation of Steam Turbines and Generators, Condensers, NC Gas removal System and Cooling Towers (Piping = 1,450 MT, Equipment = 3,600 MT)
- Electrical and C&I Works (283,000 m; 1250 instruments calibrated on site)
- HVAC and Plumbing Works.
____________________
Country: Kenya
Operating Division: Civil Engineering Works
Market: Power Generation