Olkaria I Additional Units Geothermal Power Project

Client HYUNDAI ENGINEERING COMPANY  
Supervising Engineer SINCLAR KNIGHT MERZ (NOW PART OF JACOBS ENGINEERING)
Commencement date   MARCH 2013
Completion date NOVEMBER 2014  
Project Value KES 2,531 MILLION (US$ 29.78 MILLION)  
Piling, Civil, Building, Mechanical, Piping, Firefighting, Environmental, HV, Plumbing, Electrical, Control & Instrumentation Works for a 140MW Geothermal Power Plant.
Scope of Work:
  • Piling Works (421 Nos.)
  • Civil and Building Works (Excavation = 50,000 m3; Concrete = 16,500 m3; Rebar = 1,750 MT; Structural Steel = 1,700 MT)
  • Mechanical and Piping Works including assembly and installation of Steam Turbines and Generators, Condensers, NC Gas removal System and Cooling Towers (Piping = 1,450 MT, Equipment = 3,600 MT)
  • Electrical and C&I Works (283,000 m; 1250 instruments calibrated on site)
  • HVAC and Plumbing Works.
____________________
Country: Kenya Operating Division: Civil Engineering Works Market: Power Generation