Provision of Installation of Bolted Tanks, Bitutainers and Interconnecting Pipework Services
Client |
TULLOW KENYA B.V.
7TH FLOOR, WEST END TOWERS MUTHANGARI DRIVE, OFF WAIYAKI WAY,
P.O. BOX 63298-00619 NAIROBI, KENYA |
Completion date |
MAY 2018 |
Project Value |
US$ 1,841,131.47
|
Major works executed:
Ngamia-3 Site
- Installation of 4 x 5,000 bbls site erected bolted tanks on Ngamia-3 well site.
- Supply, installation and testing of interconnecting piping, manifold and auxiliaries, for 4 x 5000bbl
Ngamia 6 – Site
- Installation of 4 x 5,000 bbls site erected bolted tanks on Ngamia-6 well site and interconnecting piping on site.
- Supply, installation and testing of interconnecting piping, manifold and auxiliaries, for 4x 5000bbls tanks.
Ngamia-8 Site
- Installation of 30 x 400 bbl bitutainers and 50 x 150bbl Iso-tanks bitutainers and interconnecting piping on site.
- Supply, installation and testing of interconnecting piping, manifold and auxiliaries, for 50 Bitutainers
- All Piping, valves and connections complied with applicable API/ANSI/ASME codes for crude oil and steam piping including API 12B Specification for storage of production liquids.
Applied Standards
- Bolted tanks to API 12B
- Feed & return lines, Control Valves and connections to PED 97/32/EC
- Pipe to API 5L standards, Valves to API standards
- Fittings to ASME 16.9 and 16.11standards, Flanges to ANSI B16.5 standards
- Tracked lifting equipment for laying and installation of pipelines
- Welding qualifications to ASME Section IX