Client | MINISTRY OF TRANSPORT & INFRASTRUCTURE/ KENYA NATIONAL HIGHWAYS AUTHORITY |
Commencement date | MARCH 2011 |
Completion date | MARCH 2017 |
Project Value | KES 6,510,771,486 (US$ 80,714,811.54) (€ 61,946,791.98) |
Major works executed comprised mainly of Rehabilitation and reconstruction works of a 63 km bitumen standard road. Rehabilitation of existing road including Improvement of the vertical and horizontal alignment of the existing road.
Rehabilitation of the existing pavement and shoulders inc1uding widening of embankment and shoulders as necessary to attain a 7.0 m wide carriageway and 2 m wide shoulders on either side;
- Construction of strengthening overlay of Dense Bitumen Macadam and asphalt concrete;
- Single surface dressing to carriageway and double surface dressing on shoulders;
- General improvement of the existing drainage facilities, including installation of new drainage system
Major quantities
- Length of road – 63 km
- Earthworks = 134,700 m3;
- Improved Sub base – 11,512m3
- Cement improved GCS – 23,634m3
- Drainage, Culverts, Slabs & Channels – 1,500 LM
- Concrete Works – 2,235m3
- Surface dressing – 6,600m3 (85-95m2/m3)
- Super pave Dense Bitumen Macadam – 74,960m3
- Asphalt Concrete – 21,520m3
Other works:
-
Bridges – 2 No.
-
Malakisi bridge