Client | MINISTRY OF ROADS & PUBLIC WORKS, KENYA/ DIRECTOR GENERAL KENYA NATIONAL HIGHWAYS AUTHORITY |
Supervising Engineer | CHIEF ENGINEER, ROADS |
Completion date | DECEMBER 2009 |
Project Value | KES 2,154,742,914 (US$ 30.8 Million) |
Major works executed comprised mainly of;
- Construction of Earthworks – 702,000 m3
- Cement stabilized sub-base and base – 179,000 m3
- Provision of a double surface dressing using 14/20mm and 6/10mm pre-coated class 4 chippings for both the carriageway and shoulder – 14,000m3
- Application of 50mm of Asphalt Concrete type 1 – 10,400m3
- Construction of pipe culverts, bridges, box culverts and other drainage works
- Protection works using stone pitching and gabions
- Provision of road furniture including road marking and traffic signs