H Young & Co. (E.A.) Ltd

The Supply, Delivery And Installation Of Steel Bridge Girders On Nzoia Bridge Along Ugunja – Ukwala – Ruambwa (Cl92) Road

Client DIRECTOR GENERAL KENYA NATIONAL HIGHWAYS AUTHORITY
Commencement date   SEPTEMBER 2020
Completion date DECEMBER 2022
Project Value KES 179,402,133.00 (US$ 1,655,001.22) (€ 1,397,164.99)
  • Supply, Erection, Corrosion Protection and Testing of Structural Steelwork for the Construction of 1No. Bridge of 70m length across Nzoia River consisting of
  • Plate Girder Type 1: Fabricate, deliver to site and install the 1100×648.41×619.89kg steel girder in grade S275 steel as Steel Plate Girder Type 1 with; 2 No. 2550x650x30mm Cover plates, 2 No. 2550X300X30mm jointed in 16mm Dia. M22 bolts General Grade HSFG and 2No. 550x860x15mm Side plates to splice joints in 16mm Dia. M20 Bolts General Grade HSFG.
  • Plate Girder Type 2: Fabricate, deliver to site and install the 1700x650x853.3kg steel girder in grade S275 steel as Steel Plate Girder Type 2 jointed with 2 No. 3500x650x30mm Cover plates, 2 No. 3500X309X30mm with 16mm Dia. M22 bolts General Grade HSFG and 2 No. 1530x630x25mm Side plates to splice joints in M20 Bolts General Grade HSFG