Client | TANZANIA INTERNATIONAL CONTAINER SERVICES LTD (TICTS) |
Supervising Engineer | AMBICON ENGINEERING LTD |
Commence date | MAY 2011 |
Completion date | AUGUST 2012 |
Project Value | US$ 6.5 MILLION |
Rehabilitation of existing container terminal, installation of new crane beam and fenders
Works executed under this contract comprised of the following
- Installation of 2 No. new MV supply cables from Existing Substation 7 (SS7) to existing quay services trench and installation of MV switchgear in SS7
Berth 8
- Breaking out of quay pavement to allow construction of seaward and landward crane rails, cable slot, tie down and storm locking points
- Breaking out of quay pavement and removal of existing fendering and installation of new concrete fender mounting units and replacement of fender system
- Installation of new crane buffers
- Patch repairs of damaged quay pavement and replacement of damaged service trench covers
________________________
Country: Tanzania
Operating Division: Civil Engineering Works
Market: Mining
________________________
Project Gallery
![](https://hyoung.com/wp-content/uploads/2013/07/Levelling-of-Crane-Beam-300x225.jpg)
![](https://hyoung.com/wp-content/uploads/2013/07/Crane-Beam-Surface-preparation-300x225.jpg)
![](https://hyoung.com/wp-content/uploads/2013/07/berthttc-300x225.jpg)
![](https://hyoung.com/wp-content/uploads/2013/07/bertsttc-300x225.jpg)
![](https://hyoung.com/wp-content/uploads/2013/07/berthttcs-300x225.jpg)
![](https://hyoung.com/wp-content/uploads/2013/07/tttcs2-300x225.jpg)