Construction of 0.65 km dual carriageway and 1.4 km loop road to bitumen standard 150mm cement stabilized GCS,150mm DBM and 50mm AC type 1. Other footpaths and cycle track

Major works executed comprised mainly of:

  1. Construction of Earthworks – 383,000 m3
  2. Cement improved (GCS 175 – 225mm) – 31,700 m3
  3. Concrete Works – drainage works, bridges, protection works – 13, 600 m3
  4. Culverts 450, 600 & 900mm (precast with concrete surround) – 2,000 m
  5. Dense Bitumen Macadam (DBM) 125mm – 8,700 m3
  6. Asphalt Concrete (50mm) – 4,800 m3
  7. Guard Rails – 8,960 m