Client | KENYA PIPELINE COMPANY |
Supervising Engineer | KPC ENGINEERING MANAGER |
Commencement date | JANUARY 2011 |
Completion date | DECEMBER 2011 |
Project Value | KES 321 MILLION (US$ 3.78 MILLION) |
Details
Upgrading of existing 12-inch pipes tank outlet to 18 inch pipes for MSP and DPK leading to a common suction header at the new pump sets 14-P-301, 14-P-302 and 14-P-303. Reconfiguration of the discharge line from new pump sets to an upgraded common discharge pipeline. Installation of valves, fittings and instrumentations____________________
Country: Kenya Operating Division: Structural Steel Works & Electro-mechanical Installations Market: Petroleum Industry____________________
Project Gallery
![](https://hyoung.com/wp-content/uploads/2011/12/Surge-Package-300x225.jpg)
![](https://hyoung.com/wp-content/uploads/2011/12/Barrelling-Area-300x225.jpg)
![](https://hyoung.com/wp-content/uploads/2011/12/DPK-Manifold-Area-300x225.jpg)
![](https://hyoung.com/wp-content/uploads/2011/12/Installation-of-Suction-Manifold-Valves-300x225.jpg)
![](https://hyoung.com/wp-content/uploads/2011/12/Tank-501-Tie-in-300x225.jpg)
![](https://hyoung.com/wp-content/uploads/2011/12/KOSF-Upgrade-Barel-II-Welding-300x225.jpg)
![](https://hyoung.com/wp-content/uploads/2011/12/New-Pipeline-Erection-300x225.jpg)