Roads

Construction of Ngong Road – Kibera – Langata Road Link (ML12) Road

Client DIRECTOR GENERAL, KENYA URBAN ROADS AUTHORITY BARABARA PLAZA-JKIA, OFF AIRPORT SOUTH ROAD ALONG MAZAO ROAD OPPOSITE AVIATION HOUSE P.O BOX 41727-00100 NAIROBI, KENYA   Completion date DECEMBER 2019 Project Value KES 2,097,520,695.00 (US$ 20,632,440.22)   Construction of 4.2 km dual carriageway and service roads linking two main roads to bitumen standard 150mm DBM and […]

Roads

Upgrading of Roads to and Within Mt Kenya National Park and Aberdare National Park

Client PRINCIPAL SECRETARY, MINISTRY OF TRANSPORT & INFRASTRUCTURE AND KENYA WILDLIFE SERVICES LTD Completion date AUGUST 2018   Project Value KES 1,045,752,961.13 (US$ 12,481,639.67)   Major works executed comprised mainly of Construction of 70 km rural bitumen and gravelling finish roads in National Parks taking consideration not to disturb the natural flora and fauna. Major […]

Roads

Upgrading of Eastleigh Roads (Phase II)

Client DIRECTOR GENERAL, KENYA URBAN ROADS AUTHORITY Completion date DECEMBER 2017 Project Value KES 667,078,139.00 (US$ 6,616,245.74) Construction of 0.65 km dual carriageway and 1.4 km loop road to bitumen standard 150mm cement stabilized GCS,150mm DBM and 50mm AC type 1. Other footpaths and cycle track Major works executed comprised mainly of: Construction of Earthworks […]

Roads

Rehabilitation Eldoret Malaba Lot II

Client MINISTRY OF TRANSPORT & INFRASTRUCTURE/ KENYA NATIONAL HIGHWAYS AUTHORITY   Commencement date   MARCH 2011 Completion date MARCH 2017   Project Value KES 6,510,771,486  (US$ 80,714,811.54) (€ 61,946,791.98)   Major works executed comprised mainly of Rehabilitation and reconstruction works of a 63 km bitumen standard road. Rehabilitation of existing road including Improvement of the […]

Roads

Rehabilitation & Upgrading of First Avenue Eastleigh & Gen Waruinge Street

Client DIRECTOR GENERAL, KENYA URBAN ROADS AUTHORITY Completion date DECEMBER 2014 Project Value KES 2,523,503,281.00 (US$ 30,673,954.35) Rehabilitation and dualling of 5 km road in a urban densely populated area. Scarification of existing surface and milling of scarified material. Site clearance and earth works. Excavation and removal of topsoil and setting out. Construction of pipe […]

Roads

Upgrading of North Pemba Rural Roads to bitumen standard

Client CHIEF EXECUTIVE OFFICER MILLENNIUM CHALLENGE ACCOUNT – TANZANIA   Supervising Engineer LEA ASSOCIATES SOUTH ASIA PVT LTD   Completion date MARCH 2014   Project Value TZS 38,247 Million (US$ 25.48 Million)   The project consisted of upgrading of 6 rural roads located in North Pemba of Zanzibar Archipelago to bitumen standard. The total length […]

Roads

Construction of Access Road to Kwale Mineral Sands Project

Client BASE TITANIUM LTD   Supervising Engineer HOWARD HUMPHREYS   Completion date AUGUST 2012   Project Value KES 482,785,725 (US$ 5.7 Million)   The access road was 7.7km consisting of a 6.5m wide main carriage way with 1m wide shoulders. It was surfaced with a 50mm layer Asphalt Concrete on the carriageway and 25mm on […]

Roads

Upgrading to Bitumen Standard of Kendu Bay Homa Bay Road

Client DIRECTOR GENERAL KENYA NATIONAL HIGHWAYS AUTHORITY   Supervising Engineer GENERAL MANAGER (DESIGN & CONSTRUCTION)   Completion date MARCH 2012   Project Value KES 3,359,623,063 (US$ 41.99 Million)   The Project road was approximately 38 km in length, located in Homa Bay County. It started at Kendu Bay at the shores of Lake Victoria, it also […]

Roads

Construction of Daraja Mbili-Nyatieko-Eronge-Kegogi-Miruka Road

Client DIRECTOR GENERAL KENYA RURAL ROADS AUTHORITY   Supervising Engineer GENERAL MANAGER (DESIGN & CONSTRUCTION)   Completion date DECEMBER 2011   Project Value KES 2,074,222,038 (US$ 30.24 Million)   The Project roads are approximately 50 km long in total and are located within the Kisii and Nyamira districts, Nyanza province primarily involved construction of a […]

Roads

Construction of Meru-Mikinduri-Maua Road

Client MINISTRY OF ROADS & PUBLIC WORKS, KENYA/ DIRECTOR GENERAL KENYA RURAL ROADS AUTHORITY   Supervising Engineer CHIEF ENGINEER, ROADS   Completion date September 2010   Project Value KES 1,918,694,062.48 (US$ 28.42 Million)   The Project road is 52 km long and covers three districts, namely North Imenti, Tigania and Igembe in Meru County and […]