Kenya

Construction of Ngong Road – Kibera – Langata Road Link (ML12) Road

Client DIRECTOR GENERAL, KENYA URBAN ROADS AUTHORITY BARABARA PLAZA-JKIA, OFF AIRPORT SOUTH ROAD ALONG MAZAO ROAD OPPOSITE AVIATION HOUSE P.O BOX 41727-00100 NAIROBI, KENYA   Completion date DECEMBER 2019 Project Value KES 2,097,520,695.00 (US$ 20,632,440.22)   Construction of 4.2 km dual carriageway and service roads linking two main roads to bitumen standard 150mm DBM and […]

Kenya

Upgrading of Roads to and Within Mt Kenya National Park and Aberdare National Park

Client PRINCIPAL SECRETARY, MINISTRY OF TRANSPORT & INFRASTRUCTURE AND KENYA WILDLIFE SERVICES LTD Completion date AUGUST 2018   Project Value KES 1,045,752,961.13 (US$ 12,481,639.67)   Major works executed comprised mainly of Construction of 70 km rural bitumen and gravelling finish roads in National Parks taking consideration not to disturb the natural flora and fauna. Major […]

Kenya

Upgrading of Eastleigh Roads (Phase II)

Client DIRECTOR GENERAL, KENYA URBAN ROADS AUTHORITY Completion date DECEMBER 2017 Project Value KES 667,078,139.00 (US$ 6,616,245.74) Construction of 0.65 km dual carriageway and 1.4 km loop road to bitumen standard 150mm cement stabilized GCS,150mm DBM and 50mm AC type 1. Other footpaths and cycle track Major works executed comprised mainly of: Construction of Earthworks […]

Kenya

Rehabilitation Eldoret Malaba Lot II

Client MINISTRY OF TRANSPORT & INFRASTRUCTURE/ KENYA NATIONAL HIGHWAYS AUTHORITY   Commencement date   MARCH 2011 Completion date MARCH 2017   Project Value KES 6,510,771,486  (US$ 80,714,811.54) (€ 61,946,791.98)   Major works executed comprised mainly of Rehabilitation and reconstruction works of a 63 km bitumen standard road. Rehabilitation of existing road including Improvement of the […]

Kenya

Construction of Relocation Units and Safety Infrastructure for Relocation Action Plan in Kibera and Mukuru Lot D

Client MINISTRY OF TRANSPORT & INFRASTRUCTURE AND KENYA RAILWAY CORPORATION   Supervising Engineer EDON CONSULTANTS INTERNATIONAL LTD   Commencement date   SEPTEMBER 2013 Completion date JUNE 2015   Project Value KES 2,154 MILLION (US$ 25.34 MILLION)   The construction covers the area between 537.150 and 539.900 along the Railway Line. The aim is to provide […]

Kenya

Rehabilitation & Upgrading of First Avenue Eastleigh & Gen Waruinge Street

Client DIRECTOR GENERAL, KENYA URBAN ROADS AUTHORITY Completion date DECEMBER 2014 Project Value KES 2,523,503,281.00 (US$ 30,673,954.35) Rehabilitation and dualling of 5 km road in a urban densely populated area. Scarification of existing surface and milling of scarified material. Site clearance and earth works. Excavation and removal of topsoil and setting out. Construction of pipe […]

Kenya

Olkaria I Additional Units Geothermal Power Project

Client HYUNDAI ENGINEERING COMPANY   Supervising Engineer SINCLAR KNIGHT MERZ (NOW PART OF JACOBS ENGINEERING) Commencement date   MARCH 2013 Completion date NOVEMBER 2014   Project Value KES 2,531 MILLION (US$ 29.78 MILLION)   Piling, Civil, Building, Mechanical, Piping, Firefighting, Environmental, HV, Plumbing, Electrical, Control & Instrumentation Works for a 140MW Geothermal Power Plant. Scope […]

Kenya

Construction of Access Road to Kwale Mineral Sands Project

Client BASE TITANIUM LTD   Supervising Engineer HOWARD HUMPHREYS   Completion date AUGUST 2012   Project Value KES 482,785,725 (US$ 5.7 Million)   The access road was 7.7km consisting of a 6.5m wide main carriage way with 1m wide shoulders. It was surfaced with a 50mm layer Asphalt Concrete on the carriageway and 25mm on […]